Selected projects that Liman-Tech has delivered or is rolling out. We anonymise client names by default — recognisable enough to be credible, discreet enough to respect operational confidentiality.

Manufacturing 2024-2026 Delivered

Major heavy engineering customer (nuclear-sector)

603 monitoring points · 3 sites

Automated vibration monitoring and technical-state prediction for dynamic equipment across the customer's facilities. Two-year delivery, 603 active monitoring points, in continuous operation.

  • 603 monitoring points
  • Continuous operation since 2024
  • Two-year deployment
Passer-VPasser-TLarus-10Strix
Manufacturing 2024-2025 Delivered

Marine propulsion equipment producer

15 MW propulsion column

Engineering, prototyping and supply of an import-substitution monitoring device for grounding-brush condition on a 15 MW electrical podded propulsion column. The device — Passer-B — was developed on the Passer-T platform and entered serial supply at the end of 2025.

  • 15 MW propulsion drive
  • Series production from end-2025
Passer-T (Passer-B variant)
Manufacturing 2024 Delivered

Major electrical-equipment manufacturer

Production-line MVP

Design and implementation of an MVP production-line monitoring and control system: line software, downtime tracking and reporting. Delivered as a foundation for further automation.

  • Production-line MVP
  • Downtime tracking & reporting
Larus-10Strix
Infrastructure 2021 Delivered

Major metropolitan rail authority

Capital city metro system

Software-hardware diagnostics complex for escalators across one of the world's largest metro networks. Equipment-parameter monitoring, client-server architecture, role-based access control.

  • Capital city metro
  • Multi-station scope
Larus-10Strix
Looking for a reference relevant to your industry — mining, O&G, cement, power? We can introduce you to a customer in production whose application is closest to yours. Talk to us →

Documented results

Major mining and metals operation

Predictive analytics for a semi-autogenous mill

Task
Evaluate detection of failure precursors using existing mill telemetry.
Equipment and solution
Process-control datasets sampled at 1 Hz, a convolutional autoencoder and domain adaptation. No additional sensors were installed for this trial.
Result
Acceptance record dated 5 May 2026: F1 91.22%, recall 80.14%, mean failure warning time 10.8 hours. Trials completed with a recommendation for deployment.

Results apply to the evaluated datasets and trial conditions, not a guarantee for other equipment.

Marine equipment manufacturer

Grounding-brush monitoring for marine propulsion

Task
Develop a replacement for an imported grounding-brush monitoring device on a 15 MW podded propulsion unit.
Equipment and solution
Analysis, redesign and prototype; CVM100 (Passer-Shch), based on Passer-T.
Result
Development, manufacture and delivery completed in December 2025 — entries 113–114 of the official Group reference list.

Delivery is confirmed. The source does not report quantified downtime reduction or savings.