Demo
- Price
- Free
- Duration
- 30–60 min · online
- Deliverable
- Live walk-through of Strix.Diagnost and Strix on reference data. We hear your pain, qualify the use case.
Scope, price, timeline and deliverables are agreed for each stage after the survey. No open-ended consulting — each step is either a report, a dashboard, or a working control loop.
Strix Connect is a free software gateway. Runs on any Windows PC, Linux server, VM, or Raspberry Pi — and starts collecting data over OPC UA and Modbus TCP / RTU in 30 minutes. Tags flow to MQTT, Kafka, REST, or our Strix platform — one URL.
$ docker run -d \
-p 4840:4840 \
-v ./config:/config \
limantech/strix-connect:latest
# poll your PLC / SCADA over OPC UA
# or connect to our cloud:
$ strix-connect connect \
--cloud=cloud.liman-tech.ru Once the data is flowing — pick a level from the table below if you need diagnostics, advisor, or full production rollout.
If your goal is to bring vibration and motor-current diagnostics onto assets, integrate with SCADA / CMMS and roll out into production. End result — hardware + software delivery (CAPEX) or tender award.
If your goal is to lift yield, cut energy, stabilize the process. End result — APC algorithm in the loop. Commercial model: one-off sale or a service contract (pay-for-result).
If you already know the critical asset and want data — go for Diagnostic Day or Gateway Pilot. For process optimization — APC Pilot. Still figuring it out? Demo, 30 minutes, no commitment.
A paid pilot filters out tire-kickers and covers our travel / hardware cost. The pilot fee is credited toward the full-deployment quote if you choose to move forward.
A pay-for-result model. Monthly base covers support; variable component is 20% of the documented savings, capped at 3–4× base. Minimum term — 36 months.
Yes. If you already have a defined need and a tender is in preparation — write under "Full deployment": we'll prepare the technical-commercial proposal, help with the technical requirements, and run a Diagnostic Day for scope clarification if useful.
On the call, we walk through reference data on a live setup, review your asset fleet, and tell you which next step makes sense — Diagnostic Day, Gateway Pilot, APC Pilot, or straight to a quote.
Asset list and operating modes, wiring diagram, failure and maintenance history, available telemetry, security requirements and site access.
A selected asset or group of components, an agreed Passer/Larus package or existing telemetry, Strix.Diagnost and Strix.Platform dashboards.
Survey and acceptance criteria → connection and data-quality checks → observation and joint event review → final report and rollout decision.
Solution diagram, data-quality and event log, diagnostic report, limitations and rollout plan. Data availability, permissible gaps, alert validation and control scenarios are agreed before starting.
Duration, price and measurable acceptance criteria are agreed after the survey and recorded in the pilot programme. Fault warning time is evaluated using the selected equipment data.
Two delivery options: purchase of the hardware/software system with deployment and support, or monitoring as a service with agreed SLAs, a base fee and, where applicable, a component tied to verified benefits.